Plans for the project to Update Jake Christiansen Stadium continue to move forward.   We are pleased that major gifts to the project have enabled us to complete the first two phases of our plan. 

Phase I – completed in August of 2010. Phase I included the installation of FieldTurf on the football field and the baseball infield.  The area under the south stadium was resurfaced and has greatly enhanced our game day atmosphere.   Two parking lots were paved - one parking lot with an 8th Street entrance and the second lot with a new 11th Street entrance.

Phase II – completed in November of 2011.  Phase II included seeding the plaza area between the football and baseball fields, the construction of a new storage facility and the demolition of the “green shed” to prepare the site for the new multi-sport locker room.   Stadium hand railings were also installed in the bleachers on both the north and south sides.

Phase III will begin once the fund raising campaign is completed.  The feature project of Phase III is a multi-sport locker room facility.  The plan for the football locker room includes 140 lockers, a coaches locker room,  an athletic training room,  an equipment room, a recruiting lounge,  a Hall of Legends that will proudly display our athletic success, and a women’s soccer locker room with 40 lockers.

 

Project Details:

FieldTurf® for Football and Baseball Infield                          

 $2,400,000           Phase I – Complete

South Stadium Area resurfaces

New Soccer Lines & Goals

Installation of a Wireless Track Timing System

Two Paved Parking Lots & Lighting                                          

 

New Storage Facility/Seeded Plaza area                                             

 $200,000             Phase II-Complete

Demolition of Green Shed          

Installation of Stadium Hand Railings                                  

 

Multi-Sport Locker Room Facility                                             

 $2,500,000           Phase III-Fundraising continues

                                                                                                                $5,100,000

Fundraising Campaign

As of November 2011, over 70% of the project costs have been pledged.  $1.4 million in pledges need to be received before we can initiate Phase III construction for the new multi-sport locker room.  Please consider making your pledge today to help us complete this project that will greatly enhance Cobber athletics.


View the PLAY BOOK

Watch the 2011 Cobber Football Recruiting Video.

Watch a time-lapse video of the turf installation

View the groundbreaking photo gallery


Information For:

current students
faculty and staff
parents
alumni
high school students
admitted students